# | PROJECT NAME | PROJECT SCOPE | SERVICES PROVIDE FOR | SERVICES BY JCC | PROJECT VALUE | SERVICE PERIOD |
---|---|---|---|---|---|---|
1 | Central Expressway Project Section 3 (from Pothuhera to Galagedara (from CH. 0+000 KM to CH. 32+450 KM), Construction of Package 1Q(CH. 12+000 KM to CH.12+890 KM) | Construction of four lane access controled road From Pothuhera to Galagedara CH. 12+000 KM to CH.12+890 KM) | MAGA Engineering (Pvt) Ltd. |
|
LKR 2.7 Bn | Mar' 23 |
2 | Central Expressway Project Section 3 (from Pothuhera to Galagedara (from CH. 0+000 KM to CH. 32+450 KM), Construction of Package 1D(CH. 3+090 KM to CH.4+400 KM) | Construction of four lane access controled road From Pothuhera to Galagedara CH. 3+090 KM to CH.4+400 KM) | KDA Weerasinghe & Company (Pvt) Ltd |
|
LKR 3.5 Bn | Feb' 23 |
3 | Central Expressway Project Section 3 (from Pothuhera to Galagedara (from CH. 0+000 KM to CH. 32+450 KM), Construction of Package 1K(CH. 8+050 KM to CH.8+850 KM) | Construction of four lane access controled road From Pothuhera to Galagedara CH. 8+050 KM to CH.8+850 KM) | Ruhunu Development Contractors and Engineers (Pvt) Ltd. |
|
LKR 961 Mn | Feb' 23 |
4 | Central Expressway Project Section 3 (from Pothuhera to Galagedara (from CH. 0+000 KM to CH. 32+450 KM), Construction of Package 1H(CH. 5+820 KM to CH.6+270 KM) | Construction of four lane access controled road From Pothuhera to Galagedara CH. 5+820 KM to CH.6+270 KM) | PND Construction (Pvt) Ltd |
|
LKR 872 Mn | Feb' 23 |
5 | Construction of Ruwanpura Expressway Phase - 01 from Kahathuduwa to Ingiriya - Package 01, Package 02, Package 03, Package 04 | Construction of four lane access controled road From Pothuhera to Galagedara Ch. 0+000 km to Ch. 7+300 km) | MAGA Engineering (Pvt) Ltd. |
|
LKR 12.9 Bn | Dec' 22 |
6 | Construction of Ruwanpura Expressway Phase 01 From Kahathuduwa to Ingiriya - Package 2 (From Ch. 7+300 km to Ch. 13+800 km) | Construction of four lane access controled road From Pothuhera to Galagedara Ch. 7+300 km to Ch. 13+800 km) | MAGA Engineering (Pvt) Ltd. |
|
LKR 12.6 Bn | Dec' 22 |
7 | Construction of Ruwanpura Expressway Phase 01 From Kahathuduwa to Ingiriya - Package 3 (From Ch. 13+800 km to Ch. 20+300 km) | Construction of four lane access controled road From Pothuhera to Galagedara Ch. 13+800 km to Ch. 20+300 km) | MAGA Engineering (Pvt) Ltd. |
|
LKR 13.5 Bn | Dec' 22 |
8 | Construction of Ruwanpura Expressway Phase 01 From Kahathuduwa to Ingiriya - Package 4 (From Ch. 20+300 km to Ch. 24+300 km) | Construction of four lane access controled road From Pothuhera to Galagedara Ch. 20+300 km to Ch. 24+300 km) | MAGA Engineering (Pvt) Ltd. |
|
LKR 15.4 Bn | Dec' 22 |
9 | Road Management Contract (RMC) for Rehabilitation and Improvement works and routine Maintenance works | Maradankadawela Habarana Tirikkondeadimadu Road (A11) From Maradankadawela to Habarana | Consulting Engineers and Contractors (Pvt) Ltd. |
|
LKR 3.1 Bn | Dec' 22 |
10 | Central Expressway Project Section 3 [From Pothuhera to Galagedara (From Ch. 0+000 km to Ch. 32+450 km), Construction of Package 1A (Ch. 0+840 km to Ch. 1+580 km) | Construction of four lane access controled road From Pothuhera to Galagedara Ch. 0+840 km to Ch. 1+580 km) | Edward And Christie (Pvt) Ltd |
|
LKR 859 Mn | Nov' 22 |
11 | Central Expressway Project Section 3 [From Pothuhera to Galagedara (From Ch. 0+000 km to Ch. 32+450 km), Construction of Package 1B (Ch. 1+584 km to Ch. 2+400 km) | Construction of four lane access controled road From Pothuhera to Galagedara Ch. 1+584 km to Ch. 2+400 km) | Edward And Christie (Pvt) Ltd |
|
LKR 743 Mn | Nov' 22 |
12 | Central Expressway Project Section 3 [From Pothuhera to Galagedara (From Ch. 0+000 km to Ch. 32+450 km), Construction of Package 1C (Ch. 2+400 km to Ch. 3+090 km) | Construction of four lane access controled road From Pothuhera to Galagedara Ch. 2+400 km to Ch. 3+090 km) | Edward And Christie (Pvt) Ltd |
|
LKR 912 Mn | Nov' 22 |
13 | Central Expressway Project Section 3 [From Pothuhera to Galagedara (From Ch. 0+000 km to Ch. 32+450 km), Construction of Package 1E (Ch. 4+400 km to Ch. 4+920 km) | Construction of four lane access controled road From Pothuhera to Galagedara Ch. 4+400 km to Ch. 4+920 km) | Edward And Christie (Pvt) Ltd |
|
LKR 997 Mn | Nov' 22 |
14 | Design and Build Water Distribution System for Aluthgama, Mathugama & Agalawatta Intergrated Water Supply Project - Package 101 | Design and Build Water Distribution Syetem | KDA Weerasinghe & Company (Pvt) Ltd |
|
LKR 1.7 Bn | Oct' 22 |
15 | Civil and Electo-Mechanical Works Kolemodera Intake and Laying of Transmission Mains for Aluthgama, Mathugama & Agalawatta Intergrated Water Supply Project - Package 102 | Civil and Electo-Mechanical Works and Laying of Transmission Mains | KDA Weerasinghe & Company (Pvt) Ltd |
|
LKR 2.3 Bn | Oct' 22 |
16 | Civil and Electo-Mechanical Works for Towers and Reservoirs and Laying of Transmission Mains for Aluthgama, Mathugama & Agalawatta Intergrated Water Supply Project - Package 104 | Civil and Electo-Mechanical Works for Towers and Reservoirs and Laying of Transmission Mains | KDA Weerasinghe & Company (Pvt) Ltd |
|
LKR 1.6 Bn | Oct' 22 |
17 | Jana Jaya City Rajagiriya Mixed Development Project, No 627, Nawala Road, Rajagiriya | Construction and Development of Shopping & Apartment complex | Nawaloka Construction (Pvt) Ltd |
|
LKR 1.6 Bn | Sep' 22 |
18 | Colombo Horana Road (B 084) Bridge No. 9/2 km Reconstruction | Reconstruction of Bridge | Edward And Christie (Pvt) Ltd |
|
LKR 285 Mn | Jun' 22 |
19 | Proposed Engineering Design and Construction of High-Rise Office complex at Sethsiripaya Premises (Sethsiripaya Stage III) | Design and Construction of High-Rise Office complex | MaAGA Engineering (Pvt) Ltd. |
|
LKR 14.1 Bn | Jun' 22 |
20 | Construction of Proposed Super-structure of New Building and Amendments, Alterations/Additions to Existing Building at 63, 63/2, 63/3, D.S. Senanayake Mawatha, Colombo 8 | Construction of Proposed Super-Structure of New Building and Amendments, Alterations/Additions to Existing Building | Nuwani Construction (Pvt) Ltd |
|
LKR 126 Mn | Mar' 22 |
21 | Design and Reconstruction of Quay at Naval Dockyard Trincomalee | Design and Reconstruction of Quay | SANKEN-ELS-HSLC Joint Venture |
|
LKR 3 Bn | Jan' 22 |
22 | Reconstruction of 25 Bridges Project Funded by Kuwait Fund for Arab Economic Development (KFAED) - Package 02 | Reconstruction of 25 Bridges | ELS Construction (Pvt) Ltd |
|
LKR 1.2 Bn | Jan' 22 |
23 | Rehabilitation/Improvement to A004 Road Selected Road Sections from Kirulapana to Godagama (from 15+360 km to 20+420 km) and B084 Road Selected Road Sections from Pamankada to Pokunuwita (From 0+500 km to 28+180 km) including 5 year of Performance Based Maintenance | Rehabilitation/Improvement of Road including 5 year of Performance based Maintenance | MAGA Engineering (Pvt) Ltd. |
|
LKR 4.2 Bn | Nov' 21 |
24 | Construction of Fishery Harbour at Wellamankara, Wennappuwa | Construction of Fishery Harbour | RR Construction (Pvt) Ltd |
|
LKR 1.8 Bn | Jul' 21 |
25 | Rehabilitation / Improvement And Maintenance of 70.02 km Rural Roads in Monaragala District in the Uva Province – Package 3 | Rehabilitation / Improvement And Maintenance of 70.02 km Rural Roads | MAGA Engineering (Pvt) Ltd. |
|
LKR 2.2 Bn | Sep' 20 |
26 | Construction of the Proposed Office Development named “Ekroma Fortune” at No.127, W.A.D.Ramanayake Mawatha, Colombo 02 | Construction of the Proposed Office Development | Nawaloka Construction (Pvt) Ltd |
|
LKR 1.7 Bn | Sep' 20 |
27 | Proposed Apartment Building at N0.96, Pagoda Road, Kotte for JAT Engineering (Pvt) Limited | Construction of Proposed Apartment Building | Nawaloka Construction (Pvt) Ltd |
|
LKR 774 Mn | Sep' 20 |
28 | Rehabilitation/ Improvement and Maintenance of 75.46 km Rural Roads in Ampara District in the Eastern Province - Package 4 | Rehabilitation/ Improvement and Maintenance of 75.46 km Rural Roads | MAGA Engineering (Pvt) Ltd. |
|
LKR 2.9 Bn | Aug' 20 |
29 | Construction of 750m3 Elevated Water Tower Wanela Water Supply Scheme - Kanthale | Construction of 750m3 Elevated Water Tower | Isuru Engineering (Pvt) Ltd. |
|
LKR 96 Mn | Aug' 20 |
30 | Construction of 750m3 Water Tower Inginiyagala, 750m3 Water Tower Namal Oya, 600m3 Water Tower Thottama, Staff Quarters and Ancillary Works Integrated Water Supply Scheme for Unserved Areas of Amapara District – Phase iii Project | Construction of Water Supply Scheme | Isuru Engineering (Pvt) Ltd. |
|
LKR 2.2 Bn | Aug' 20 |
31 | Contract For Construction of 750m3 Water Tower Central Camp, 1000m3 Water Tower Bakkiella, Staff Quarters And Ancillary Works | Construction of Water Supply Scheme | Isuru Engineering (Pvt) Ltd. |
|
LKR 256 Mn | Aug' 20 |
32 | Rehabilitation/ Improvement and Maintenance of 70.92 km Rural Roads in Colombo District in the Western Province - Package 2 | Rehabilitation/ Improvement and Maintenance of 70.92 km Rural Roads | Gamini Construction. |
|
LKR 2.2 Bn | Jul' 20 |
33 | Relocation of Manning Market from Pettah to Peliyagoda - Construction of Superstructure | Relocation of Manning Market/Construction of Superstructure | MAGA Engineering (Pvt) Ltd. |
|
LKR 3.8 Bn | Jun' 20 |
34 | Construction of Warehouse and Related Facilities at Galle Municipal Council | Construction of Warehouse and Related Facilities | JCK Construction (Pvt) Ltd. |
|
LKR 135 Mn | Mar' 20 |
35 | Rehabilitation/ Improvement to Jaffna- Ponnalai - Point Pedro Road | Rehabilitation/ improvement of Road AB 21 | Sierra Construction Limitecd. |
|
LKR 1.1 Bn | Feb' 20 |
36 | Urban Regeneration Project - City of Colombo, Construction and Finance for Completion of Balance Work of Housing Project at Kalinga Mawatha, Colombo 05 | Construction and Finance for Completion of Balance Work of Housing Project | MAGA Engineering (Pvt) Ltd. |
|
LKR 1.3 Bn | Feb' 20 |
37 | Urban Regeneration Project - City of Colombo - Stage II, Construction of Proposed 479 Housing Units at Applewatte | Construction of Proposed 479 Housing Units | MAGA Engineering (Pvt) Ltd. |
|
LKR 1.6 Bn | Feb' 20 |
38 | Rehabilitation and Improvement, Periodic Maintenance & Routine Maintenance Works of 51.7 km of National Roads in Galle District | Rehabilitation and Improvement, Periodic Maintenance & Routine Maintenance Works of 51.7 km of National Roads | KDA Weerasinghe & Company (Pvt) Ltd. |
|
LKR 6.1 Bn | Jan' 20 |
39 | Improvements & Rehabilitation of B174 Kaduwela - Athurugiriya Road Section From (0+000 km - 9+500 km) and B451 Walgama - Athurugiriya Road Section From (0+000 km - 1+250 km) | Improvements & Rehabilitation of Roads | Hovael Construction (Pvt) Ltd. |
|
LKR 1.6 Bn | Aug' 19 |
40 | Matara stage iv water supply project | Construction of Water Treatment Plant including Intake, Treatment Plant, Ground Reserviours, Elevated Water Tanks and Pipe Laying | Kolon - Samsung C & T Joint Venture. |
|
LKR 2.4 Bn USD 76 Mn |
Jul' 19 |
41 | Design and Construction of Trunk Sewers, Branch Sewers and Service connections, Manhole pump stations and supply of operation and Maintenance Equipment Kandy City Waste Water Management Project | Design and Construction of Trunk Sewers, Branch Sewers and Service connections, Manhole pump stations and supply of operation and Maintenance Equipment | Kolon Global Corporation. |
|
LKR 3.3 Bn JPY 3.5 Bn |
Apr' 19 |
42 | Ruhunupura Distribution Water Supply Project | Construction of Water Supply Project | KDA Weerasinghe & Company (Pvt) Ltd. |
|
LKR 1.9 Bn | Jan' 19 |
43 | Supply and Laying of DI, HDPE & PVC Pipes and Specials for Transmission and Distribution Systems in Chilaw WSS (Bangadeniya & Bingiriya) and Puttalam WSS (Kaladiya & Manaltivu) | Supply and Laying of DI, HDPE & PVC Pipes and Specials for Transmission and Distribution Systems | KDA Weerasinghe & Company (Pvt) Ltd. |
|
LKR 177 Mn | Jan' 19 |
44 | Rehabilitation of Moragoda Ela (Main Canal & Temple Bypass) in Galle | Rehabilitation of Moragoda Ela (Main Canal & Temple Bypass) | Business Promoters & Partners Engineering (Pvt) Ltd. |
|
LKR 844 Mn | Sep' 18 |
45 | Rehabilitation/Improvement and Maintenance of 65.46KM Rural Road in Badulla District in the Uva Province - Package 4 | Rehabilitation/Improvement and Maintenance of 65.46KM Rural Road | Ruhunu Development Contractors and Engineers (Pvt) Ltd. |
|
LKR 2.1 Bn | Apr' 18 |
46 | Rehabilitation/Improvement and Maintenance of 77.99KM Rural Road in Badulla District in the Uva Province - Package 5 | Rehabilitation/Improvement and Maintenance of 77.99KM Rural Road | Ruhunu Development Contractors and Engineers (Pvt) Ltd. |
|
LKR 2.5 Bn | Apr' 18 |
47 | Construction of Subgrade and its Ancillary Works of The Main Road and Local Road in the Section of K36+000 – K42+000 of The Main Contract | Construction of Subgrade and its Ancillary Works of The Main Road and Local Road for 6 km | TEAM Engineering. |
|
LKR 729 Mn | Feb' 18 |
48 | Design, Supply and Installation of 33kV Medium Voltage Electrical Distribution System in Defense Headquarters Complex Project at Akuregoda | Design, Supply and Installation of 33kV Medium Voltage Electrical Distribution System | Ceylex Engineering (Pvt) Ltd. |
|
LKR 664 Mn | Feb' 17 |
49 | Southern Transport Development Project - Pinnaduwa to Matara Road in the Section of K30+800 – K36+000 | Construction and upgrading of approximately 5.2 km stretch of the Pinnaduwa - Kodagoda Road | KSJ Construction. |
|
LKR 143 Mn | Oct' 17 |
50 | Proposed Re-Development Project-Stage I for One Colombo Projects (Pvt) Ltd at Slave Island, Colombo 02 | Proposed Re-Development Project | SAW Engineering (Pvt) Ltd. |
|
LKR 703 Mn | Aug' 17 |
51 | Low Voltage Electrical Distribution System (LVEDS) of Block 08 of the Proposed Defence Headquarters Complex at Akuregoda | Installation of Low Voltage Electrical Distribution System (LVEDS) for Proposed Block | Luminex (Pvt) Ltd. |
|
LKR 123 Mn | Jun' 16 |
52 | Construction of Office Building Complex of Independent Television Network ltd, at Wickramasinhapura, Battaramulla | Construction of Office Building Complex | RH Steel Building Systems (Pvt) Ltd. |
|
LKR 120 Mn | Jul' 16 |
53 | Low Voltage Electrical Distribution System of Block 06, Defence Headquarters Complex at Akuregoda | Low Voltage Electrical Distribution System | Kent Venora Joint Venture. |
|
LKR 37 Mn USD 1.7 Mn |
May' 16 |
54 | Rehabilitation/Improvements of 77 km of Rural Roads in Nuwara Eliya District -Contract 1 Including performance based maintenance for three years | Rehabilitation/Improvements of 77 km of Rural Roads | Sierra Construction Limited. |
|
LKR 2.2 Bn | May' 16 |
55 | Rehabilitation/Improvements of 39 km of Rural Roads in Nuwara Eliya District -Contract 2 Including performance based maintenance for three years | Rehabilitation/Improvements of 39 km of Rural Roads | Sierra Construction Limited. |
|
LKR 1.2 Bn | May' 16 |
56 | Rehabilitation/Improvements of 65 km of Rural Roads in Nuwara Eliya District -Contract 3 Including performance based maintenance for three years | Rehabilitation/Improvements of 65 km of Rural Roads | Sierra Construction Limited. |
|
LKR 2 Bn | May' 16 |
57 | Asian Development Bank Funded Northern Road Connectivity Project, NP 03 | Construction of Road Connectivity Project | Consulting Engineers and Contractors (Pvt) Ltd. |
|
LKR 329 Mn | Dec' 15 |
58 | Asian Development Bank Funded Northern Road Connectivity Project, NP 04 | Construction of Road Connectivity Project | Consulting Engineers and Contractors (Pvt) Ltd. |
|
LKR 310 Mn | Dec' 15 |
59 | Asian Development Bank Funded Northern Road Connectivity Project, NP 05 | Construction of Road Connectivity Project | Consulting Engineers and Contractors (Pvt) Ltd. |
|
LKR 344 Mn | Dec' 15 |
60 | Rectification of Failed Embankment Slopes to Protect Public Properties on Project Roads | Rectification of Failed Embankment Slopes | Selltec Group (Pvt) Ltd |
|
LKR 9 Million | Apr' 15 |
61 | World bank funded Provincial Road Project (Uva Provincial Counsil) | Construction of Road Project | CML-MTD Construction Ltd. |
|
LKR 713 Mn | Oct' 13 |
# | PROJECT NAME | PROJECT SCOPE | SERVICES PROVIDE FOR | SERVICES BY JCC | PROJECT VALUE | SERVICE PERIOD |
---|---|---|---|---|---|---|
1 | Construction and Remedying Defects of the Proposed 300 Roomed 4 Star Hotel at 282/3,282/4,282/8 and 282/7, Kollupitiya Road, Colombo 03 for Marine Drive Hotel Private Limited | Proposed 300 Roomed 4 Star Hotel | Tudawe Brothers (Pvt) Ltd |
|
USD 20 Mn | Jun' 21 - Mar' 23 |
2 | Proposed Construction of Park Inn by Radisson Colombo City Hotel at 295 & 295A, Galle Road, Colombo 03 | Proposed Construction of Park Inn | Tudawe Brothers (Pvt) Ltd |
|
LKR 2.9 Bn | Jun' 21 - Mar' 23 |
3 | Urban Regeneration Project (Phase - II) - City of Colombo, Design and Construction of 672 Housing Units at Aluth mawatha, Mattakkuliya | Design and Construction of 672 Housing Units | Tudawe Brothers (Pvt) Ltd |
|
LKR 2 Bn | Jun' 21 - Mar' 23 |
4 | Construction of Remedying Defect of the Expansion of National Measurement Laboratory of the Department of Measurement Unit, Standards and Services at Pitipana, Homagama | Construction of Remedying Defect of the Expansion of National Measurement Laboratory | Tudawe Brothers (Pvt) Ltd |
|
LKR 1.3 Bn | Jun' 21 - Mar' 23 |
5 | Improvement and Rehabilitation of B449 Wadduwa- Moronthuduwa Road (Sections 0+000 KM 5+ 300 KM) & B544 Bellana - Moragala Road (Sections 0+000 KM - 9+800 KM) | Rehabilitation/ improvement of B449 from (0+000 - 5+300km) and Section from (0+000 - 9+800km) | MAGA Engineering (Pvt) Ltd. |
|
LKR 1 Bn | Jan' 20 - Oct' 22 |
6 | Construction of Proposed 48 Rooms Hotel for Waters Edge Limited, At Battaramulla | Construction of Proposed 48 Rooms Hotel | Sathuta Builders (Pvt) Ltd. |
|
LKR 1.3 Bn | Jan' 20 - Dec' 21 |
7 | Rehabilitation/Improvement and maintenance of 83.36 KM rural roads in Colombo District in the Western Province - Package 2 | Rehabilitation/Improvement and maintenance of 83.36 KM rural roads | Jiangxi Youse Construction (Group) Co. Ltd. |
|
Jul' 19 - Jul' 19 | |
8 | Rehabilitation/Improvement and maintenance of 94.22 KM rural roads in Colombo District in the Western Province - Package 3 | Rehabilitation/Improvement and maintenance of 94.22 KM rural roads | Jiangxi Youse Construction (Group) Co. Ltd. |
|
Jul' 19 - Jul' 19 | |
9 | Rehabilitation/Improvement and maintenance of 82.01 KM rural roads in Gampaha District in the Western Province - Package 1 | Rehabilitation/Improvement and maintenance of 82.01 KM rural roads | Jiangxi Youse Construction (Group) Co. Ltd. |
|
Jul' 19 - Jul' 19 | |
10 | Rehabilitation/Improvement and maintenance of 82.68 KM rural roads in Gampaha District in the Western Province - Package 2 | Rehabilitation/Improvement and maintenance of 82.68 KM rural roads | Jiangxi Youse Construction (Group) Co. Ltd. |
|
Jul' 19 - Jul' 19 | |
11 | Rehabilitation/Improvement and maintenance of 82.79 KM rural roads in Kalutara District in the Western Province - Package 4 | Rehabilitation/Improvement and maintenance of 82.79 KM rural roads | Jiangxi Youse Construction (Group) Co. Ltd. |
|
Jul' 19 - Jul' 19 | |
12 | Rehabilitation/Improvement and maintenance of 87.87 KM rural roads in Kalutara District in the Western Province - Package 5 | Rehabilitation/Improvement and maintenance of 87.87 KM rural roads | Jiangxi Youse Construction (Group) Co. Ltd. |
|
Jul' 19 - Jul' 19 | |
13 | Rehabilitation and Improvements to Peradeniya-Badulla-Chenkaladi Road From Passara to Lunugala (150+800KM to 171+800 KM) | Rehabilitation and Improvements from 150+800KM to 171+800 KM | AMSK Construction (Pvt) Ltd. |
|
LKR 2.8 Bn | Jul' 19 - Nov' 22 |
14 | Heightening of Minipe Anicut water control & Measurement facilities for Left Bank and Right Bank canals - Mahaweli water security invesment programme | Heightening of Minipe Anicut water control & Measurement facilities for Left Bank and Right Bank canals | AMSK Construction (Pvt) Ltd. |
|
LKR 1.8 Bn | Jul' 19 - Nov' 22 |
15 | Rehabilitartion/Improvement and maintanance of 63.76 KM rural roads in the Monaragala District in the UVA Province - Package 01 | Rehabilitartion/Improvement and maintanance of 63.76 KM rural roads | AMSK Construction (Pvt) Ltd |
|
LKR 2.2 Bn | Jul' 19 - Nov' 22 |
16 | Rehabilitation/Improvement and maintenance of 95.48 KM rural roads in Vavuniya District in the Northern Province - Package 1 | Rehabilitation/Improvement and maintenance of 95.48 KM rural roads | Chaina Railway 25th Bureau Group Co. Ltd. |
|
LKR 3.4 Bn | Oct' 18 - Oct' 18 |
17 | Rehabilitation/Improvement and maintenance of 56.03 KM rural roads in Mannar District in the Northern Province - Package 1 | Rehabilitation/Improvement and maintenance of 56.03 KM rural roads | Chaina Railway 25th Bureau Group Co. Ltd. |
|
LKR 3.5 Bn | Oct' 18 - Oct' 18 |
18 | Rehabilitation/Improvement and maintenance of 67.64 KM rural roads in Jaffna District in the Northern Province - Package 2 | Rehabilitation/Improvement and maintenance of 67.64 KM rural roads | Chaina Railway 25th Bureau Group Co. Ltd. |
|
LKR 3 Bn | Oct' 18 - Oct' 18 |
19 | Rehabilitation/Improvement and maintenance of 71.81 KM rural roads in Jaffna District in the Northern Province - Package 3 | Rehabilitation/Improvement and maintenance of 71.81 KM rural roads | Chaina Railway 25th Bureau Group Co. Ltd. |
|
LKR 3.8 Bn | Oct' 18 - Oct' 18 |
20 | Rehabilitation/Improvement and maintenance of 100.31 KM rural roads in Vavuniya District in the Northern Province - Package 4 | Rehabilitation/Improvement and maintenance of 100.31 KM rural roads | Chaina Railway 25th Bureau Group Co. Ltd. |
|
LKR 3.3 Bn | Oct' 18 - Oct' 18 |
21 | Rehabilitation/Improvement and maintenance of 64.22 KM rural roads in Jaffna District in the Northern Province - Package 5 | Rehabilitation/Improvement and maintenance of 64.22 KM rural roads | Chaina Railway 25th Bureau Group Co. Ltd. |
|
LKR 3.2 Bn | Oct' 18 - Oct' 18 |
22 | Rehabilitation/Improvement and maintenance of 71.98 KM rural roads in Batticaloa District in the Eastern Province - Package 1 | Rehabilitation/Improvement and maintenance of 71.98 KM rural roads | Chaina Railway 25th Bureau Group Co. Ltd. |
|
LKR 3.1 Bn | Oct' 18 - Oct' 18 |
23 | Rehabilitation/Improvement and maintenance of 76.76 KM rural roads in Batticaloa District in the Eastern Province - Package 2 | Rehabilitation/Improvement and maintenance of 76.76 KM rural roads | Chaina Railway 25th Bureau Group Co. Ltd. |
|
LKR 3.2 Bn | Oct' 18 - Oct' 18 |
24 | Rehabilitation/Improvement and maintenance of 74.38 KM rural roads in Trincomalee District in the Eastern Province - Package 1 | Rehabilitation/Improvement and maintenance of 74.38 KM rural roads | Chaina Railway 25th Bureau Group Co. Ltd. |
|
LKR 3.3 Bn | Oct' 18 - Oct' 18 |
25 | Rehabilitation/Improvement and maintenance of 80.93 KM rural roads in Ampara District in the Eastern Province - Package 3 | Rehabilitation/Improvement and maintenance of 80.93 KM rural roads | Chaina Railway 25th Bureau Group Co. Ltd. |
|
LKR 3 Bn | Oct' 18 - Oct' 18 |
26 | Rehabilitation/Improvements to B084 (South) Road & A004 Road Including 5 Years of Performance Based Maintenance. | Rehabilitation/Improvements to B084 section From (From 13+800km to 28+180km) & Section From Kirulapona to Godagama (From 00+130km to 01+000km and From 15+360km to 16+280km) | Keangnam Enterprices Ltd. |
|
LKR 3 Bn | Aug' 18 - Aug' 22 |
27 | Rehabilitation/Improvements of 77Km of Rural Roads in Kandy District -Contract 1 Including performance based maintenance for three years | Rehabilitation/Improvements of 77Km of Rural Roads in Kandy District -Contract | Sierra Construction Limited. |
|
LKR 1.7 Bn | Jan' 18 - Mar' 18 |
28 | Rehabilitation/Improvements of 71Km of Rural Roads in Kandy District -Contract 2 Including performance based maintenance for three years | Rehabilitation/Improvements of 77Km of Rural Roads in Kandy District -Contract | Sierra Construction Limited' |
|
LKR 1.9 Bn | Jan' 18 - Mar' 18 |
29 | Rehabilitation/Improvement of 67KM Length of Nawatkuli - Karaitivu Mannar Road A032 | Construction of 67 KM of Nawatkuli - Karaitivu Mannar Road | CML-MTD Construction Ltd. |
|
LKR 1.7 Bn | Aug' 14 - Dec' 15 |
30 | Rehabilitation/Improvements of 98km of Rural Roads in Matara District - Contract 1 Including Performance Based Maintenance for Three Years | Rehabilitation/ Improvements of 98km of Rural Roads in Matara District | CML-MTD Construction Ltd. |
|
LKR 3.3 Bn | Oct' 17 - Dec' 19 |
31 | Rehabilitation/Improvements of 60km of Rural Roads in Hambanthota District - Contract 02 Including Performance Based Maintenance for Three Years | Rehabilitation/ Improvements of 60km of Rural Roads in Hambanthota District | CML-MTD Construction Ltd. |
|
LKR 1.2 Bn | Oct' 17 - Oct' 20 |
32 | Rehabilitation/Improvements of 62km of Rural Roads in Matale District - Contract 3 including Performance Based Maintenance for Three Years | Rehabilitation/ Improvements of 62km of Rural Roads in Matale District | CML-MTD Construction Ltd. |
|
LKR 1.4 Bn | Oct' 17 - Jan' 23 |
33 | Southern Transport Development Project Construction of Four Lane (04) Expressway from Pinnaduwa to Matara section K30+800 - K45+000 | Construction of Four Lane (04) access control Expressway from Pinnaduwa to Matara section K30+800 - K45+000 | China National Technical Import & Export Corporation. |
|
LKR 8 Bn | Sep' 17 - Dec' 17 |
34 | Rehabilitation/Improvements of 63km of Rural Roads in Galle District - Contract 02 Including Performance Based Maintenance for Three Years | Construction of 63km of Rural Roads in Galle District | KDA Weerasinghe & Company (Pvt) Ltd. |
|
LKR 1.4 Bn | Sep' 17 - Oct 19 |
35 | Rehabilitation/Improvements of 74km of Rural Roads in Galle District - Contract 03 Including Performance Based Maintenance for Three Years | Construction of 74km of Rural Roads in Galle District | KDA Weerasinghe & Company (Pvt) Ltd. |
|
LKR 1.7 Bn | Sep' 17 - Dec' 21 |
36 | Construction of Central Expressway Project (CEP-2) Package -B from Riloluwa (CH 46+800KM) to Ranagallepola (CH 57 + 000 KM) | Construction of Central Expressway Project from Riloluwa (CH 46+800KM) to Ranagallepola (CH 57 + 000 KM) | Sierra-Olympus-Tudawe-CEC JV. |
|
LKR 34 Bn | May' 17 - Nov' 21 |
37 | Rehabilitation / Improvements of 74KM of rural roads in the Kandy District - Contract 3 Including performance based maintenance for three years | Construction of 74KM of rural roads in the Kandy District | Edward And Christie (Pvt) Ltd. |
|
LKR 2 Bn | Nov' 16 - May' 22 |
38 | Rehabilitation / Improvements of 57KM of rural roads in the Matale District - Contract 2 Including performance based maintenance for three years | Construction of 57KM of rural roads in the Matale District | Edward And Christie (Pvt) Ltd. |
|
LKR 1.2 Bn | Nov' 16 - Oct' 22 |
39 | Construction of Proposed Building for Telecommunication Regulatory Commission at Sooriyawewa, Hambantota | Construction of Building | Tudawe Brothers (Pvt) Ltd. |
|
LKR 2.4 Bn | Aug' 16 - Mar' 23 |
40 | Construction and Remedying Defect of the Construction of Additions, Modifications and Improvements for Sri Lanka Youth Lalith Ethulathmudali Vocational Training Centre at Rathmalana Phase I for National Youth Services Council | Proposed Additions, Modifications and Improvements for Sri Lanka Youth Lalith Ethulathmudali Vocational Training Center at Ratmalana | RH Steel Building Systems (Pvt) Ltd. |
|
LKR 44.5 Mn | Jul' 16 - Apr' 23 |
41 | Major Bridges Construction Project of the National Road Network - Package 1 | Bridge Construction | Wakachiku Construction Co. Ltd. |
|
LKR 4.3 Bn | Aug' 16 - Apr' 19 |
42 | Rehabilitation and Improvement of Galauda - Kandaketiya - Karametiya Road (UVA 02) | Rehabilitation and Improvement of Road | Komuthi Engineering Services (pvt) Ltd. |
|
LKR 764 Mn | May' 13 - Dec' 21 |
43 | JICA Funded Provincial Road Development Project in Central and Sabaragamuwa Provinces RP01-B | Road development project | Nawaloka Construction (Pvt) Ltd. |
|
LKR 333 Mn | Dec' 12 - Dec' 14 |
44 | World Bank Funded Provincial Road Project in Jaffna District NP02 | Road Construction | Nawaloka Construction (Pvt) Ltd. |
|
LKR 427 Mn | Dec' 12 - Apr' 14 |
45 | World Bank Funded Provincial Road Project in Ampara EP01 | Road construction | Sierra Construction Limited. |
|
LKR 398 Mn | May' 12 - Mar' 21 |
46 | World Bank Funded Provincial Road Project in Jaffna District NP01 | Road construction | Sierra Construction Limited. |
|
LKR 458 Mn | May' 12 - Mar' 14 |
47 | Conflict Affected Region Emergency Project PL07 | Road construction | Sierra Construction Limited. |
|
LKR 302 Mn | May' 12 - Sep' 14 |
48 | Matale - Wattegama Road Project, Matale | Road Construction | Selltec Group (Pvt) Ltd. |
|
LKR 1.8 Bn | Jun' 15 - Aug' 16 |
# | PROJECT NAME | PROJECT SCOPE | SERVICES PROVIDE FOR | SERVICES BY JCC | PROJECT VALUE | SERVICE PERIOD |
---|---|---|---|---|---|---|
1 | Proposed Elevated Highway from Rajagiriya to Athurugiriya | Environmental Survey Feasybility stage | Road Development Authority |
|
Nov' 18 - Feb' 19 | |
2 | Sothern Economic Corridor Town Development Project | Improvement/ Rehabilitation of National Road 1 From 157 KM to 165 KM - Bavat Urban Road Section 8.3 KM | Ministry of Public Works and Transport |
|
USD 19.7 Mn | Mar' 17 - Jun' 17 |